[ET Net News Agency, 18 October 2017] CGN Power (01816) said the total on-grid power
generation of the nuclear power generating units operated and managed by the Group from
January to September 2017 amounted to around 101,328.49 GWh, an increase of 21.83% over
the corresponding period last year.
In the third quarter of 2017, the Group had conducted refueling outage of Yangjiang Unit
2, Ningde Unit 4 and Fangchenggang Unit 2. As of 30 September 2017, the refueling outage
of the above units was in progress as planned. (HL)