[ET Net News Agency, 8 February 2018] Zijin Mining (02899) said its planned production
volumes of major mineral products for the year 2018 are: 37 tonnes of mine-produced gold,
244,000 tonnes of mine-produced copper, 311,700 tonnes of mine-produced lead and zinc
(including 274,100 tonnes of mine-produced zinc and 37,600 tonnes of mine-produced lead),
213 tonnes of mine-produced silver and 2.6 million tonnes of iron concentrate.
The plan was made in light of the current economic condition, market situation and the
existing conditions of Zijin Mining. (HL)